Some crossings are not allowed to curve. A railroad, a state highway or a gravity sewer wants a straight steel casing at an exact elevation, and that is an auger boring machine's job.

Call (678) 264-3333Estimates are free. Call now.
Davis Underground Solutions, Inc.

Serving Savannah · Chatham County

Davis Underground Solutions, Inc.

Directional drilling and boring across Georgia; locates, bore plan and utility coordination handled. More about Davis Underground Solutions →

(678) 264-3333

Straight, cased and on grade

Picture a pit dug beside the road to the depth of the finished pipe. A track is leveled in the bottom of it, aimed at a target stake on the far side, and the boring machine is set on the track. A length of steel casing goes in front of the machine with a cutting head at its tip and a continuous-flight auger inside. The machine turns the auger and jacks the casing forward at the same time; the head cuts, the auger brings the cuttings back into the pit, and the casing follows into the hole it has just made. A welder joins the next length, and the cycle repeats until the head appears in the receiving pit. Because the casing never leaves the line the track was aimed on, the pipe placed inside it afterward sits exactly where the drawing says, which is the point of the whole exercise for a gravity line.

Savannah crossings that call for it

Norfolk Southern and CSX cross Georgia on main lines and spurs, and both require a cased, jacked crossing with their own engineering sign-off. GDOT asks for a casing under most state routes, and counties often follow suit on arterials. Sewer and storm extensions that pass under a street between manholes need the grade a casing provides. Airports, levees and dam embankments usually forbid any steered bore at all. Each of these is an auger job before it is anything else.

What the ground does to the plan

A standard auger head is built for soil. Under much of the Piedmont around Savannah the soil runs out and rock begins at a depth that may be above or below the casing invert, so the crew looks at the geology, drills a test hole if the answer is unclear, and brings a rock cutting head or a guided pilot when needed. On the Coastal Plain the face is sand that wants to run, so the operator keeps the head slightly inside the casing and the push steady, and the pit is shored and dewatered. Davis Underground Solutions, Inc. owns its auger machines and its directional rigs, so the crossing gets the tool it needs rather than the tool that happened to be on the trailer. Drawings for the railroad or GDOT application are prepared in house; Davis Underground Solutions has photos of completed crossings. Estimates are free. Call now: (678) 264-3333.

Estimates are free. Call now: (678) 264-3333.

Other drilling and boring services in Savannah

Questions about auger boring in Savannah

What size steel casing can you jack in Savannah?+

From 12-inch up to 36-inch casings on the standard machines, larger with heavier equipment and deeper pits. The owner's permit and the carrier pipe decide the diameter and wall thickness.

How far can one push go?+

A single push of 60 to 200 feet covers most road and track crossings. Line and grade get harder to hold beyond that, and the crew will propose two pits and a mid-crossing structure when the distance calls for it.

Why can't the sewer just be directionally drilled?+

Because a steered bore follows an arc and cannot guarantee a constant fall. A gravity sewer needs the exact slope a cased auger bore provides.

How long does the railroad part take?+

The push itself takes days; the railroad's engineering review, insurance certificate and flagging schedule take weeks, so the application goes in first.

Is the estimate free?+

It is. Send the crossing drawing and the permit, or call (678) 264-3333 now, and the crew will walk the site and price the pits, the casing and the carrier.

Free Estimates

Tell us what needs to go in the ground in Savannah.

Length of the run, what is being installed (conduit, duct, water, sewer, gas), what it has to cross, and where the plans stand. A crew that bores for a living can usually price it from that and a site walk.

Estimates are free. Call now. (678) 264-3333
  • ✓ Road, driveway, creek and rail crossings without cutting the surface
  • ✓ Conduit, duct, casing and product pipe from 2" to large diameter
  • ✓ Locates, bore plans and utility coordination handled
  • ✓ Crews travel; a mobilization fee is quoted up front on far jobs

Request a free estimate

Goes straight to Davis Underground Solutions. You will hear back within 24 hours.

No obligation. Your details go only to the drilling contractor handling your area.